44.01 stores CO2 as rock on site. How will it scale?

Two announcements three weeks apart brought 44.01 onto my radar.

On 15 October, Frontier buyers signed an $11.7M offtake with 44.01 to remove 20,932 tonnes of CO2 between 2028 and 2031. This is Frontier’s first in-situ mineralization offtake and its largest by far in the mineralization category. Then, on 4 November, Holcim and JERA announced their investment in the company, with existing investors ALIAD (Air Liquide’s venture arm) and Climate Investment adding more.

Different kinds of backers – a carbon removal coalition buying tonnes, a cement major and Japan’s largest power generator buying equity – are betting on the same storage technique, and that is why I think 44.01 deserves a closer look even when the round size or valuation isn’t public.

44.01 sells permanent carbon storage, and this is relevant to both carbon removal and industrial decarbonization. Today, removal buyers are the only ones to sign a binding contract. The bigger prize is storage for emitters, but that market needs lower costs and a carbon price that most of 44.01’s target geographies do not have yet.

What makes turning CO2 into rock interesting?

In conventional carbon capture and storage (CCS), CO2 emissions are captured, compressed and injected into a deep sedimentary basin. Often, suitable locations are far from CO2 production/waste sites, requiring long pipelines and permits that Frontier notes can take five to ten years.

44.01 follows a completely different principle. It dissolves CO2 in water, then injects it about a kilometre underground into fractures in igneous rock formations – peridotite, a magnesium-rich rock, in the case of its first pilots. The CO2 reacts with the rock and forms solid carbonate. Because the fluid is denser than groundwater and turns to rock within a few years, monitoring after injection is far shorter than for a buoyant CO2 plume in an aquifer.

It calls itself “in-situ” mineralization, because the goal is to capture and store the CO2 near the point of production, avoiding the logistics and permissions headache of transportation pipelines. Industrial emitters near 44.01’s site in Fujairah sit within 50 km of suitable peridotite, but more than 300 km from viable conventional storage in the Gulf. If storage can sit next to the emitter, smaller and inland sources that cannot justify a pipeline get an option they did not have before.

The company can serve two kinds of buyers. Biogenic CO2, like the stream from biogas upgrading at a wastewater treatment plant in the Frontier project, becomes carbon removal sold to voluntary buyers. Fossil CO2 captured from a cement kiln, as in the Holcim pilot, cuts the emitter’s Scope 1 emissions. The rock and wells stay the same, and only the buyer’s reason for paying changes. Removal buyers pay for a climate claim, while emitters pay to abate (whose demand only becomes obligated where a carbon price forces it).

How has the business evolved, and how does it compare?

Founded in Oman in 2020 and now headquartered in London, 44.01 started out selling storage to carbon removal buyers. Stripe Climate was its first customer in 2021, and Shopify bought its mineralization credits the following year. Pilots moved from Oman to Fujairah, where a 2023 project with ADNOC mineralized 10 tonnes in under 100 days. A $37M Series A in 2024, co-led by Equinor Ventures and Shorooq Partners, brought in Air Liquide, Siemens, Sumitomo and Amazon’s Climate Pledge Fund, followed by a $5M extension from Nysnø and Jasoor in 2025. By December 2025, its upgraded Fujairah borehole had an estimated capacity of 25,000 tonnes a year, and the Holcim pilot became its first project with an industrial customer.

The model is mineralization as a service with two revenue lines: a per-tonne storage fee from emitters, and removal tonnes sold to carbon removal buyers.

Its closest peer is Carbfix in Iceland, which uses the same dissolved-CO2 method in a different igneous rock: basalt. Carbfix took a different route to its first commercial hub. Its Coda Terminal received a €115M EU Innovation Fund grant covering roughly a third of the project’s cost, with the remainder planned through investors in a project SPV. 44.01 is approaching the same step with corporate venture equity behind it, in a region without an equivalent grant pool.

Holcim has gone from pilot funder to investor, and has stated that in-situ mineralization can help it manage captured carbon at inland sites across its operations where offshore storage may be limited. That describes a storage gap across a global plant network, a much larger market than one site in Fujairah. JERA has also described its investment rationale as a chance to deepen its understanding of the technology. Neither has signed a commercial storage contract yet.

What will it take for 44.01 to scale?

Frontier contracting over 20,000 tonnes in this pathway tells me it sees promise in the scale. It estimates that reactive rock formations could store over 5 billion tonnes of CO2 a year. Two things still need solid answers:

Costs have to come down: Frontier buyers are paying about $559 a tonne by my arithmetic, a price that bundles CO2 capture, storage and verification. That is roughly 50% above Frontier’s other geological storage deals, such as Vaulted Deep. Frontier pays early premiums by design. But the whole case for in-situ mineralization is avoided transport cost. If storing a tonne in peridotite ends up costing more than piping it to an aquifer, that advantage disappears.

The data has to hold: The Holcim pilot’s data run ends in early 2027, and the Frontier contract is built to test whether injection can run continuously for years. Isometric’s in-situ mineralization module identifies a technical risk: carbonate forming near the well can reduce permeability and injectivity over time. Any lender looking at a commercial well field will ask how long a single well can run operations.

The crediting methodologies already exist. Isometric’s module covers injection into basalts and ophiolites, with crediting on injection. Puro.earth has issued credits for biogenic CO2 from a wastewater biogas plant stored geologically in Norway, the same CO2 source as 44.01’s Frontier project. 44.01 has not publicly registered a project yet.

The next capital will likely come from the cap table. Commercial well fields are infrastructure-shaped and will need project-level money sooner than a typical venture company does. My read is that if the 2027 data is promising, the strategics already on the cap table will take that role as project equity, before conventional lenders step in.

Where will demand come from?

Carbon removal from the VCM: At current prices, I do not see removal demand coming from anyone beyond Frontier’s members and a handful of similar buyers. Frontier’s Growth AMC now asks for a line of sight to compliance or policy demand before it signs large deals. Prices have to fall for these credits to work in either the voluntary market or compliance markets.

Storage for industrial emitters in compliance markets: This needs an emitter that has an obligation to reduce its emissions. Norway, where 44.01 has joined the MiniCCS research project, sits under the EU ETS. Japan’s GX-ETS is now mandatory but carries a price corridor far below storage costs, and JERA is already studying shipping CO2 to Australia. The Gulf has no domestic carbon price, so Holcim’s demand there is strategic rather than obligated.

The rock type for this technology is widespread, and is a markedly different technical challenge than storing in sedimentary basins. That gives 44.01 a first-movers advantage. Frontier points to Japan, Oman, Finland, inland Norway and the US Pacific coast, and India’s Deccan basalts also belong to the same family of reactive igneous rocks. For 44.01, the binding constraint is who pays to fill the wells.